From: Reiber, Loretta
Sent: Wednesday, June 10, 2009 2:37 PM
To: 'Johnson, Rachel M. (Crossett)'
Subject: RE: Chemical Plant wastewater streams

On the PPS forms for Outfall 001, the detection level achieved for arsenic was listed as 2.0 µg/l.  It’s required to be 0.5 µg/l.  The test result was listed as <0.5.

 

-----Original Message-----
From: Johnson, Rachel M. (Crossett) [mailto:RachelM.Johnson@gapac.com]
Sent: Wednesday, June 10, 2009 2:27 PM
To: Reiber, Loretta
Subject: Chemical Plant wastewater streams

 

Loretta,

The wastewater discharges from the chemical plant are as follows:

 

From the Formaldehyde plant – RCI distillates

From the Resin Manufacturing – Glass Mat distillates, Prepolymer distillates, Vacuum sump discharges, and Red water impoundment discharges

From the Tall Oil plant – API separator discharges

 

They also discharge storm water runoff from the site as well as boiler and cooling tower blow-down.  Please let me know if you need any additional information.

 

Rachel M. Johnson

Environmental Engineer

Georgia-Pacific Crossett Paper Operations